Themabewertung:
  • 0 Bewertung(en) - 0 im Durchschnitt
  • 1
  • 2
  • 3
  • 4
  • 5
Quantity Surveying Building Estimation With Cad And Excel (updated 11/2021)
#1
[Bild: q3w9g1ykedmwxytwurjixttjat.jpg]

Quantity Surveying Building Estimation With Cad And Excel (updated 11/2021)
MP4 | Video: h264, 1280x720 | Audio: AAC, 44.1 KHz
Language: English | Size: 18.7 GB | Duration: 39h 57m

Quantity Surveying,Quantity Takeoff,Steel Estimation,Rate Analysis,B.O.Q,Payments To Contractor,Interim Payment In Excel



What you'll learn
Estimation Of Complete Project Through Auto-cad And Excel
Estimation Of Complete Project Through PDF Files/Hard Copy
Beginner Training For Plan Swift
Estimation Of Complete Project Through Plan Swift Software
Bar bending Schedule Of Foundation,Columns,Beams,Slab,Stairs, In Excel
How to Find Material Like Cement,Sand,Coarse Aggregates,Bricks
Complete Material Statement In Excel
Rate Analysis For Different Works Like ,Excavation, P.C.C, R.C.C, Masonry, Tiles, Plaster, Paint In Excel
Will Learn How to Create B.O.Q Of Project
Mode Of Payments To Contractor
Interim Payment In Excel
Microsoft Excel For Beginners
Primavera P6 Training For Beginners
Auto-cad 2020 For Beginners
MS Project Training For Beginners
Activities And W.B.S List In MS Excel
Adding Manpower In Excel (Labor, Mason, Carpenter etc.)
Finding The Duration Of Activities Based On Productivity
Complete Project In Primavera p6 (Activities ,W.B.S, Relationship, Creating And Assigning Resources And Much More
Complete Project In MS PROJECT (Activities ,W.B.S, Relationship, Creating And Assigning Resources And Much More

Requirements
• To have the Auto Cad And M.S Excel installed in your computer.
• To have the minimum understanding for Civil Quantity/Estimation
• To have a minimum understanding of construction processes.

Description
Complete Updated Course Last Update 09/2021

Complete Package.

Complete Project Estimation Through AutoCAD And Excel.

Complete Project Estimation (Manual Calculations PDF Drawings Same Project.)

Complete Project Estimation (Through Plan Swift Software Same Project)

Primavera P6 Training For Beginners.

We Will Create Complete Project In Primavera P6 (Same Project For Which We did Estimation)

MS Project 2019 Training For Beginners

We Will Create Complete Project In MS PROJECT (Same Project For Which We did Estimation)

Excel Training For Beginners.

Autocad Training For Beginners.

Welcome to Quantity Surveying /Building Estimation online training course. it is focused on practical application of Estimation using Auto Cad & M.S Excel

This course is a field oriented course and contains real examples and a full fledge real project for better understanding

After successful completion of this course, you will be able to Estimate Any Building Project (From Foundation To Finishing)

Major Topics That We Will Learn In This Course:

Quantity Of Substructure (Isolated Footing) Through AutoCAD

Excavation Quantity

Formwork Calculations

Concrete Quantity

Quantity Of Sloped Footing Through AutoCAD

Excavation Quantity

Formwork Calculations

Concrete Quantity

Quantity Of Raft Foundation Through AutoCAD

Excavation Quantity

Formwork Calculations

Concrete Quantity

Quantity Of Different Items In Superstructure Through AutoCAD

Column In S.S (Formwork, Concrete)

Grade Beams (Formwork ,Concrete )

Slab On Grade (Formwork , Concrete)

Lintel And Top Beam (Formwork , Concrete)

Slab (Concrete And Formwork)

Brick Works

Plaster Works

Tile And Marble Works

Paint Works

Quantity Of Substructure (Isolated Footing) Manual Calculations PDF File Or Hard Copy Of Drawings

Excavation Quantity

Formwork Calculations

Concrete Quantity

Quantity Of Different Items In Superstructure Through PDF File, Manual Calculations

Column In S.S (Formwork ,Concrete)

Grade Beams (Formwork ,Concrete )

Slab On Grade (Formwork , Concrete)

Lintel And Top Beam (Formwork , Concrete)

Slab (Concrete And Formwork)

Brick Works

Plaster Works

Tile And Marble Works

Paint Works

Quantity Of Substructure (Through Planswift)

Excavation Quantity

Formwork Calculations

Concrete Quantity

Quantity Of Different Items In Superstructure (Through Planswift)

Column In S.S (Formwork, Concrete)

Grade Beams (Formwork, Concrete )

Slab On Grade (Formwork, Concrete)

Lintel And Top Beam (Formwork, Concrete)

Slab (Concrete And Formwork)

Brick Works

Plaster Works

Tile And Marble Works

Paint Works

Bar bending Schedule:

Bar-bending Schedule Of Isolated Footing

Bar-Bending Schedule Of Raft Foundation

Bar-bending Schedule Of Column Necks And Columns

Bar-bending Schedule Of Beams

Bar-bending Schedule Of Stairs

Bar Bending Schedule Of Slab

Bar-Bending Schedule Of Two Way Slab

Rate Analysis Of Different Works:

Rate Analysis For Excavation

Rate Analysis For Plain Cement Concrete (P.C.C)

Rate Analysis For Reinforcement Concrete (Column Beam And Slab)

Rate Analysis For Masonry Work

Rate Analysis For Plaster Work

Rate Analysis For Tile Work

Rate Analysis For Paint Work

Material Statement :

Material Statement In Excel

Bill Of Quantity (B.O.Q)

Bill Of Quantity For A Project According To CSI Codes

Mode Of Payments To Contractor

Interim Payment

Advance Payment

Secured Advance

Petty Advance

Mobilization Advance

Procedure To Create Interim Payment In Excel From Scratch.

Primavera P6 Training For Beginners

As We are Doing Same Project In Primavera So This Training Is For Those Who Are Beginners In Planning OR In Primavera.

Complete Project In Primavera P6 With The Help Of MS Excel.

Creating Activity List In Ms Excel.

Add Manpower And Their Productivity In MS Excel

Adding Duration To Activities Based On Productivity

Creating Project In Primavera P6

Importing All Of Activities From Excel To P6

W.B.S And Relationship For Activities

Creating And Assigning Resources To Activities (Work And Material Resources)

Update The Project According To Actual (Time And Cost)

MS PROJECT Training For Beginners

As We are Doing Same Project In MS Project So This Training Is For Those Who Are Beginners In Planning OR In MS Project.

Complete Project In MS Project With The Help Of MS Excel.

Creating Activity List In Ms Excel.

Add Manpower And Their Productivity In MS Excel

Adding Duration To Activities Based On Productivity

Creating Project In MS Project

Importing All Of Activities From Excel To MS Project

W.B.S And Relationship For Activities

Creating And Assigning Resources To Activities (Work And Material Resources)

Update The Project According To Actual (Time And Cost)

Excel Training For Beginners

As Excel Is Important For This Course So I Have Add Basic Training And Formulas For Those Who Are Beginners In Excel

Auto-cad Training

As Auto-cad Is Also Essential For This Course So I Have Also Included Auto-cad Training For Those Who Are Beginner In Auto-cad


Who this course is for:
• Site Engineers
• Civil Engineers
• Fresh Engineers.
• Quantity Surveyors
• Those who wants to pursue a career as a Quantity Surveyor/ Estimator
• Civil Engineering Students

Homepage

[Bild: 001concreteforslabong92ji7.jpg]



Download from Rapidgator:
Zitieren


Möglicherweise verwandte Themen…
Thema Verfasser Antworten Ansichten Letzter Beitrag
  Geomatics & Advance Surveying Panter 0 106 09.04.2024, 14:59
Letzter Beitrag: Panter
  Advanced Quantity Surveying & Cost Estimation With AutoCad Panter 0 107 30.03.2024, 09:51
Letzter Beitrag: Panter
  Quantity Estimating & Costing For Building Panter 0 128 30.01.2024, 22:10
Letzter Beitrag: Panter
  Gain Mastery Of Over 135+ Excel Functions (Office 2021) Panter 0 139 12.11.2023, 13:00
Letzter Beitrag: Panter
  Excel Bootcamp A-Z | The Hands-On Excel Training Panter 0 215 18.05.2023, 03:35
Letzter Beitrag: Panter
  Learn Microsoft Excel Fast - The Advanced Excel Course Panter 0 181 18.05.2023, 03:19
Letzter Beitrag: Panter

Gehe zu:


Benutzer, die gerade dieses Thema anschauen: 1 Gast/Gäste
Expand chat